Procedure of slump test for concrete: Clean the cone. Dampen with water and place on the slump plate. The slump plate should be clean, firm, level and non-absorbent. Collect a sample of concrete to perform the slum test. Stand firmly on the footpieces and fill 1/3 the volume of the cone with the sample. Compact the concrete by 'rodding' 25 times.

Learn More

How To Do Slump Test Of Concrete?

Here are the steps to do the slump test of concrete. 1. Get a concrete sample. When a truck mixer reaches the checkpoint, the quality engineer should check the delivery note to ensure that the concrete delivered is in compliance with the concrete grade required for the concrete element to be cast. Roll the drum for a certain time to completely mix the concrete inside.

Learn More

Making Concrete Cylinders in the Field — What, why, & how

For concrete with slump 1-inch (25-mm) or higher, either rodding or vibrating is permitted. Determine the number of layers of concrete to be placed in the mold For concrete to be consolidated with the tamping rod, place concrete in 3 equal layers for 6 ´ 12-inch cylinders; and in 2 equal layers for 4 ´ 8-inch cylinders

Learn More

QUALITY CONTROL IN CONCRETE CONSTRUCTION WORK

Workability of concrete is an important property of concrete while concrete is in its fresh state. Therefore slump test or compaction factor test should be performed to check workability of concrete. About three tests should be carried out for every 25 m 3 of concrete.

Learn More

BrandBold Brilliance Concrete Acid Stain - Truly Taupe

BrandBold Brilliance Concrete Acid Stain is a reactive stain designed to produce an appealing, mottled finish on cured concrete surfaces. This is Step 2 in the BrandBold Brilliance Concrete Acid Stain System. BrandBold Brilliance Concrete Acid Stain reacts with minerals already present in the concrete, giving the look and feel of natural stone. Each concrete slab accepts the stain in erratic

Learn More

Modified Slump Test to Measure Rheological Parameters of

The apparatus and test procedure are described. Semi-empirical models are proposed for the yield stress and for the plastic viscosity as function of the final slump and slumping time. The application of the modified slump test for the evaluation of the viscosity is limited to concretes with a slump of 120 to 260 mm.

Learn More

Slump test - Concrete

The slump test is a means of assessing the consistency of fresh concrete. It is used, indirectly, as a means of checking that the correct amount of water has been added to the mix. The test is carried out in accordance with BS EN 12350-2, Testing fresh concrete. Slump test . The steel slump cone is placed on a solid, impermeable, level base and

Learn More

Slump Test Of Concrete - Detailed Procedure [Civil Planets

Test Procedure. All the apparatus should be free from moisture or any other affluent and also it should be in dry condition. Step 1 – First, place the slump cone mould over the smooth surface pan then fill the fresh concrete in layers up to the slump cone mould top. Step 2 – Each layer of filled concrete should be tamping up to 25 times by

Learn More

How to Building Construction Process Step by Step

How to Build a Concrete House Step by Step? 1. Testing quality of building materials 2. Site verification with reference to drawings 3. Sources of water and location of storage tank 4. Soil classification from trial pit 5. Mark the layout of main building 6. Material stacking plan 7. Verification of all the drawings and designs 8. Anti-termite

Learn More

CONCRETE - Boral

slump test practices. If the slump test is to determine whether or not the concrete is to be accepted, the sample must be taken from the early part of the load. Never take the sample from the first concrete out of the mixer. Let out at least 0.2 of a cubic metre before taking a test sample.

Learn More

A Simple Guide to Concrete Cube Testing

Place the damp slump cone on a flat, hard surface. Fill the cone with the concrete sample in three stages. Once each stage is filled, tamp the mix with the tamping rod 25 times. After the third tamping the excess concrete shall be struck off flush to the top of the cone.